The construction and the material of the Safemount II assembly has achieved the approval of the German TÜV. Actual the 50 & the 60 t model has been certified. The larger assemblies for 80 / 100 and 150 t are based on the same design and should follow immediately.
The Safemount assembly is simply bolted between the silos legs and the foundation. Within the certified forces there are no rods or staybars required.