Supplier sign in
Home
STAY INFORMED
Subscribe to our monthly newsletter.
Your email address will never be disclosed to any third party.
Read our privacy notice.

       

Product news
09.03.2026  |  59x
Share this item

Modernizing a legacy lime slaking system at Waste-to-Energy Plant

Modernizing a legacy lime slaking system at the Leverkusen Waste-to-Energy Plant

Processing 210,000 tons of waste per year for ~720,000 people, the facility relies on an advanced flue gas treatment system where lime slurry neutralizes acid gases.

The challenge:
A Wallace & Tiernan® paste slaking system installed in 1995 had become obsolete, with no spare parts available.

Sodimate Deutschland GmbH designed a targeted retrofit, preserving existing tanks and pumps while upgrading key components:
➡️ silo discharge and dosing systems
➡️ lime slaking units
➡️ water dosing systems
➡️ Brother washers

During installation, a mobile plant ensured continuous lime slurry supply, avoiding downtime.

The result:
✔ smooth operation of both lines
✔ stable lime slurry production (~2,700 L/h)
✔ improved reliability and long-term maintainability

This project proves that aging installations can be modernized efficiently and sustainably.

Operating an older lime slaking system?
A retrofit could extend its lifetime and improve performance.

Company information

PORTALS
BulkSolids-Portal Schuettgut-Portal Recycling-Portal
Related
Bulkgids.nl
SIGN UP FOR OUR NEWSLETTER
Newsletter archive
Service and contact
ContactDisclaimerPrivacyAdvertising
FOLLOW US
Linked