IFAT Entsorga, Messe,
Supplier sign in
Home
Suppliers
News
Jobs
Events
Articles
STAY INFORMED
Subscribe to our monthly newsletter.
Your email address will never be disclosed to any third party.
Read our
privacy notice.
EVENT
07-05-2012 – 11-05-2012
Share:
Type:
Duration:
5 days
Starts:
07-05-2012
Ends:
11-05-2012
Place:
Entry:
paid
Related items
Biomass-Silo provide Gerolding with Energy
Miscanthus, wood chips, dust and powder
Geroldinger sees the pelletization of biomass fuels as a waste of energy, therefore first flow experiments were carried out with the the biomass "miscanthus". The technological challenge of this product is the low bulk density of only 140kg/m³. Based on the laboratory results the silo and heating system of our plant was produced. The annual heat requirement of 1500 hours at full load by 150kW involves the heating of all operational buildings (warehouse and office areas) and the peak loads caused by the paint shop. The heating system consists of a standard industrial combustion boiler, a self-made 25,000 liters of hot water storage for providing the energy for the peak heat load, a housed intake pit (equipped with a dedusting unit) and four screw-conveyors (500mm diameter) to ensure a rapid take over of materials from suppliers. The resulting combustion is almost pure ash from the boiler transported pneumatically into a silo. The 650m ³ concrete silo,…
17-02-2012 |
18047
| product news |
Continue reading
PORTALS
✓
BulkSolids-Portal
Schuettgut-Portal
Recycling-Portal
Related
Bulkgids.nl
SIGN UP FOR OUR NEWSLETTER
Newsletter archive
Service and contact
About, Contact
Disclaimer
Privacy
Advertising
Control panel login
Follow us
Linked
Supplier sign in
✕
Choose your company:
Company not listed? Request a listing
Please leave your details and we'll create a listing.
Company name
Title
—
Mr
Ms
Contact person
E-mail address
Phone
‹ different company
Password
‹ different company
Forgot password?
Your name:
Send link
Didn't receive the e-mail? E-mail address out of date?