Supplier sign in
Home
STAY INFORMED
Subscribe to our monthly newsletter.
Your email address will never be disclosed to any third party.
Read our privacy notice.

       

EVENT
07.05.2012 - 11.05.2012
Share this event
Type:
Duration: 5 days
Starts: 07.05.2012
Ends: 11.05.2012
Place: München

Entry: paid

 

Related items

Pallmann brings cutting-edge recycling equipment and systems to IFAT Entsor Experience Pallmann at the Ifat hall C2 203/302
Pallmann brings cutting-edge recycling equipment and systems to IFAT Entsor
Experience Pallmann at the Ifat hall C2 203/302 The all-rounder “TIGER” PSRT 1000 x 1250 robust single-shaft shredder on the stand is one of Pallmann’s principal machines for the sector. It is ideal for separating tyre rubber from steel inlays, cleaning tyre wire, shredding safety flooring, carpets, electric cables, electronic waste, rubber seals with steel inlays, and much more. This comprehensive range of uses means that the TIGER can be retrofitted to many existing systems or used as a stand-alone machine. In many cases, its exceptional shredding performance means users no longer need to invest in additional pre- and post-shredding equipment. Stand-out elements of the shredder are its highly durable shredding components, and knives that can be used in both rotation directions. The patented construction design makes it possible to change the rotation direction at regular intervals. This keeps the knives sharp, contributing to consistent product quality and keeping maintenance requirements to a minimum. The
11.04.2012  |  12322x  |  Press release  |   | 
Biomass-Silo provide Gerolding with Energy Miscanthus, wood chips, dust and powder
Biomass-Silo provide Gerolding with Energy
Miscanthus, wood chips, dust and powder Geroldinger sees the pelletization of biomass fuels as a waste of energy, therefore first flow experiments were carried out with the the biomass "miscanthus". The technological challenge of this product is the low bulk density of only 140kg/m³. Based on the laboratory results the silo and heating system of our plant was produced. The annual heat requirement of 1500 hours at full load by 150kW involves the heating of all operational buildings (warehouse and office areas) and the peak loads caused by the paint shop. The heating system consists of a standard industrial combustion boiler, a self-made 25,000 liters of hot water storage for providing the energy for the peak heat load, a housed intake pit (equipped with a dedusting unit) and four screw-conveyors (500mm diameter) to ensure a rapid take over of materials from suppliers. The resulting combustion is almost pure ash from the boiler transported pneumatically into a silo. The 650m ³ concrete silo,
17.02.2012  |  16468x  |  Product news  | 
PORTALS
BulkSolids-Portal Schuettgut-Portal Recycling-Portal
Related
Bulkgids.nl
SIGN UP FOR OUR NEWSLETTER
Newsletter archive
Service and contact
ContactDisclaimerPrivacyAdvertising
FOLLOW US
Linked